To be used under screed for all types of structural concrete floors. Suitable for new build, refurbishments, and conversions.
Re-Mat Base 3 (3mm thickness) is ideal for projects with minimal height restrictions while still achieving excellent acoustic performance.
Complies with the latest version of Approved Document E of the building regulations.
To be used under screed for all types of structural concrete floors. Suitable for new build, refurbishments, and conversions.
Re-Mat Base 6 (6mm thickness) provides the optimal balance between acoustic performance and build-up height. Tested as a single 6mm layer.
Complies with the latest version of Approved Document E of the building regulations.
To be used under screed for all types of structural concrete floors. Suitable for new build, refurbishments, and conversions.
Re-Mat Base 10 (10mm thickness) offers maximum acoustic performance for the most demanding acoustic requirements.
Complies with the latest version of Approved Document E of the building regulations.
Treated floor with: Isocheck Re-Mat Base 3
Impact Improvement: 18dB ΔLw when placed below a 65mm sand/cement screed
Dynamic Stiffness: 10MN/m³ (BS EN 29052-1:1992)
Construction complies with the latest version of Approved Document E of the building regulations.
- Site results (in red) for Building Control approval.
- Laboratory results (in blue) for comparison.
Treated floor with: Isocheck Re-Mat Base 6
Impact Improvement: 18dB ΔLw when placed below a 65mm sand/cement screed
Dynamic Stiffness: 10MN/m³ (BS EN 29052-1:1992)
Construction complies with the latest version of Approved Document E of the building regulations. Tested as a single 6mm layer.
- Site results (in red) for Building Control approval.
- Laboratory results (in blue) for comparison.
Treated floor with: Isocheck Re-Mat Base 10
Impact Improvement: 18dB ΔLw when placed below a 65mm sand/cement screed
Dynamic Stiffness: 10MN/m³ (BS EN 29052-1:1992)
Construction complies with the latest version of Approved Document E of the building regulations.
- Site results (in red) for Building Control approval.
- Laboratory results (in blue) for comparison.
Isocheck Re-Mat Base 3 manufactured by Isomass Ltd. Units 10 & 11, Avenue Business Park, Elsworth, Cambridgeshire CB23 4EY and installed in accordance with manufacturer's instructions / recommendations.
Isocheck Re-Mat Base 6 manufactured by Isomass Ltd. Units 10 & 11, Avenue Business Park, Elsworth, Cambridgeshire CB23 4EY and installed in accordance with manufacturer's instructions / recommendations.
Isocheck Re-Mat Base 10 manufactured by Isomass Ltd. Units 10 & 11, Avenue Business Park, Elsworth, Cambridgeshire CB23 4EY and installed in accordance with manufacturer's instructions / recommendations.
The floor surface should be swept free of any loose debris that may damage or bridge the system.
Butt joint and seal all roll edges of Isocheck Re-Mat Base 3. At perimeters overlap Re-Mat Base 3 onto a right angle flanking edge strip which should be turned up all vertical surfaces to allow a minimum 50mm to protrude above the intended FFL of the screed.
Perimeter overlaps or butt joints should be sealed with a min 100mm wide duct tape.
Services that penetrate the screed should be isolated by wrapping with Re-Mat Base 3 which again would be taped.
When trafficking the floor take care not to perform any unnecessary actions that may cause any of the taped joints to be forced apart.
The floor surface should be swept free of any loose debris that may damage or bridge the system.
Butt joint and seal all roll edges of Isocheck Re-Mat Base 6. At perimeters overlap Re-Mat Base 6 onto a right angle flanking edge strip which should be turned up all vertical surfaces to allow a minimum 50mm to protrude above the intended FFL of the screed.
Perimeter overlaps or butt joints should be sealed with a min 100mm wide duct tape.
Services that penetrate the screed should be isolated by wrapping with Re-Mat Base 6 which again would be taped.
When trafficking the floor take care not to perform any unnecessary actions that may cause any of the taped joints to be forced apart.
The floor surface should be swept free of any loose debris that may damage or bridge the system.
Butt joint and seal all roll edges of Isocheck Re-Mat Base 10. At perimeters overlap Re-Mat Base 10 onto a right angle flanking edge strip which should be turned up all vertical surfaces to allow a minimum 50mm to protrude above the intended FFL of the screed.
Perimeter overlaps or butt joints should be sealed with a min 100mm wide duct tape.
Services that penetrate the screed should be isolated by wrapping with Re-Mat Base 10 which again would be taped.
When trafficking the floor take care not to perform any unnecessary actions that may cause any of the taped joints to be forced apart.
Find Isocheck Re-Mat Base 3 on NBS Source for detailed specifications and BIM objects.
Find Isocheck Re-Mat Base 6 on NBS Source for detailed specifications and BIM objects.
Find Isocheck Re-Mat Base 10 on NBS Source for detailed specifications and BIM objects.